Run cable now only where a wall or ceiling is actually being opened, and run it to the one spot where every cable will end. If a wall is going down to the studs, every cable you might ever want in it goes in before insulation, because it will never be this cheap again.
Walls that stay closed can wait. Rooms that stay finished we can still wire later, and we keep the cut small enough for a blank plate. We don't patch or paint.
Decide where every cable ends first
Every cable comes back to one central spot, usually a utility room, a basement closet or a garage wall that doesn't get too hot. Plan it before anything is pulled. If the remodel is moving where the internet comes in, or where the rack lives, settle that before the rough-in, because a run that ends in the wrong closet is a run you pull twice.
Ask yourself the same question about the walls: which ones are really coming open? A remodel rarely opens the whole house. It's a kitchen, a primary suite, a basement finish. The open rooms are where you load up.
Where to run network, camera and TV cable while it's open
Two open walls are worth extra cable. The first is plaster. Plenty of older Seattle houses still have it. If a plaster wall is coming down, wire it now. Plaster is the wall you don't want cut later. The second is a wall that sits on the way to somewhere else. If the hall wall is open floor to ceiling, drop one cable through it from the basement to the attic. That's your upstairs access point.
These spots are cheap to wire now and slow to wire later:
- Ceilings for access points. One Cat6 to each ceiling spot where you want an access point. A finished ceiling is the slow part of any retrofit, especially with a finished floor above it. Open, it's a quick run.
- Desks and offices. Two Cat6 drops per desk. Both pull together, so the second one adds little, and a phone reboot doesn't take the computer with it.
- The TV wall. If it's open, wire it now.
- Camera soffits. This is the one people overshoot. A camera on a second-story soffit looks tidy and records the tops of heads. Eight to ten feet off the ground is the height you can identify someone from, so pull camera cable to the first-floor eaves and walls at that height, at the doors and the driveway.
- The garage, and wherever the recorder will go. Cameras home-run to the recorder, and if it's a PoE recorder it powers them, so there's no separate PoE switch to buy for them.
On cable, don't overspend. Cat6 for every data drop in the house. Cat5e is enough for cameras and doorbells. Cat6a only earns its cost on a single run longer than about 150 feet, like a detached garage across the lot.
Conduit to the attic: one, and know what it's for
Conduit is a spare path, not a substitute for cable to the rooms. Conduit everywhere costs more than just running the cable. So the rooms you know you'll use get cable now, and one conduit from the network spot up to the attic or down to the crawlspace keeps a door open for whatever comes next.
If what you want it for is fiber down the road, we run it separately and leave it empty for the fiber. It doesn't get filled with copper now.
Coordinating with your GC
Cable goes in after the electrician, before insulation. The risk is showing up after the insulation crew. We coordinate the timing with your builder, and we supply a drop plan up front so you can sign off on locations before the walls close.
What to ask the GC, and what to expect from us:
- Who seals the holes. Ask your GC who fills the holes we drill.
- What happens to the ends during drywall. Drywall crews cover cable ends or cut around them. We run and label at rough-in and come back after finishes to terminate and test.
- Who handles the electrical side. Need an outlet behind the TV? Our licensed electricians can do that on the same schedule, so there's one walkthrough instead of another contractor.
One thing you can do yourself: before the insulation goes in, photograph every open wall with a tape measure in the shot. You'll use those pictures for years.
If you want the drop plan done before rough-in, book a walkthrough.
Have questions about your project? Contact us for a free estimate.



